× This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies. Read more here

Fuel for Olkiluoto 3 EPR is in Olkiluoto

8.2.2018

​ The fuel required for the start of electricity production at OL3 EPR has now arrived in Olkiluoto. The 241 fuel assemblies needed for fuel loading, as well as four spare assemblies, have been inspected and transferred inside the plant. A total of 128 tons of uranium is needed in the reactor.